IMPORTANT: RRB EXAM PORTAL is NOT associated with Railway Recruitment Board(RRB) or Indian Railways.

: Disclaimer :
RRB EXAM PORTAL is NOT associated with Railway Recruitment Board or Indian Railways. 
For RRB official website visit - www.rrcb.gov.in

RRB JOBS QUESTION BANK : CHIEF LOCO INSPECTOR - DIESEL LOCOMOTIVES - MULTIPLE CHOICE QUESTIONS

QUESTION BANK FOR SELECTION TO THE POST OF CHIEF
LOCO INSPECTOR -DIESEL (MECHANICAL DSL)
 
Diesel Locomotives - Multiple Choice Questions
 
1 What  is  the  minimum  Head  light  Focusing  distance required in the locomotives provided with electrical head light? . d
a) 100 meters
b) 1000 meters              
c) 2000 meters
d) 250 meters and above
 
2 What is the Fuel oil tank capacity in WDP1 locomotive in litres? c
a) 4000 b) 5000
c) 3000 c) 2000
 
3 When OPS drops or LLOB trips, the engine will_____ . b
a) Raise b) Shutdown
c) Comes to Idle d) Hunting
 
4 Expressor lube oil pump is driven by____. b
a) Gear
b) Chain
c) Motor
d) Belt
 
5 The exhaust manifold is connected to______part of the TSC. a
a) Gas Inlet Casing
b) Intermediate Casing
c) Turbine Casing
d) Blower Casing 
 
6 One  of  the  following  is  the  equipment  in  Nose compartment .c
a) MR1
b) MR2
c) Control   air   pressure reservoir
d) All the above
 
7 How many Power Contactors are available in  WDG4 Locomotive? .d
a) 7
b) 9 
c) 8
d) 0
 
8 What  is  the  Lube oil  capacity(in  litres)  in  WDP1 locomotives? a
a) 760
b) 910
c) 1100
d) 1457
 
9 If white smoke is emitting from exhaust chimney, what could be the reason? a
A) Water  mixed  with  fuel
b) Governor oil mixed with fuel
c) Lube oil mixed with fuel
d) None of these oil
 
11 Water leaking continuously from water telltale pipe .b
a) Dummy it  and  work
b) Fail the loco further
c) Do fast pumping
d) Work on lower notches
 
12 Cooling Water capacity in WDM2 locomotive is liters..d
a) 900
b) 910 
c) 1300
d) 1210
 
13 The rundown test of NAPIER Turbo is to be conducted on_______notch. a
a) Idle
b) 4
c) 6
d) 2
 
14 During one of the following occasions Hot engine alarm indication will get c
a) Continuous 8th  notch working
b) Excess load
c) Water pump not working expansion tank  
d) Full water in
 
15 The lube oil   consumption   for   every 100   liters consumption of fuel on  WDM2/WDG4 is b
a) 1.7/1.0 ltrs
b) 1.5/0.5 ltrs 
c) 1.6/0.7 ltrs
d) 1.0/0.3 ltrs
 
16 ………………..type  of   speedometer   is   available on WDG4. b
a) Mechanical
b) Radar Sensor
c) Electrical
d) Electronic
 
17 The more Oxygenated Air is required for better_______ . b
a) Control air pressure
b) Combustion  of fuel
c) Braking
d) Cooling
 
18 Hot engine alarm (HEA) will come at ______ degrees centigrade in WDG3A locos. c
a) 60
b) 70
c) 90
d) 80
 
19 Electro Pneumatic Governor is located in c
a) Expressor room
b) Radiator room
c) Nose compartment
d) Rear compartment
 
20 During the MR air pressure efficiency test ___kg /cm2 pressure should be created within minutes. d
 
a) 1.0 , 7
b) 1.5 , 6
c) 0.9 , 8
d) 0.7 , 5
 
 

Study Kit for Railway Recruitment Board (RRB) Exams

<< Go Back to Main Page

Courtesy: Indian Railway

IMPORTANT: RRB EXAM PORTAL is NOT associated with Railway Recruitment Board(RRB) or Indian Railways, For RRB official website visit - www.rrcb.gov.in